2010 Cadillac Truck Escalade/ESV RWD V8-6.2L Page 1595
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
瀚慖f within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
瀚慖f less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
CADILLAC Diagnostic and Repair Information ,Wiring Diagrams. DTC. TSB. Types: TSB, DTC, Wiring Diagrams, OEM Procedures. Trusted by more than 400,000 technicians. OEM accurate fix for faster repairs. Repair Procedures and Labor Times. Factory Auto Repair info. Request A Demo Today. Factory-Correct Diagrams. Factory Part Numbers. Maintenance Schedules. Repair Procedures. Labor Times. Types: TSB, DTC.
Showing posts with label Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed. Show all posts
Showing posts with label Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed. Show all posts
Saturday, October 24, 2020
Saturday, June 13, 2020
2010 Cadillac Truck Escalade RWD V8-6.2L Page 1595
2010 Cadillac Truck Escalade RWD V8-6.2L Page 1595
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
瀚慖f within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
瀚慖f less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
瀚慖f within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
瀚慖f less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
Monday, June 8, 2020
2010 Cadillac Truck Escalade RWD V8-6.2L Page 1485
2010 Cadillac Truck Escalade RWD V8-6.2L Page 1485
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
瀚慖f within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
瀚慖f less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
瀚慖f within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
瀚慖f less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
瀚慖f the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
瀚慖f the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
Thursday, October 31, 2019
2010 Cadillac Truck Escalade ESV AWD V8-6.2L Page 1696
2010 Cadillac Truck Escalade ESV AWD V8-6.2L Page 1696
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
锟斤拷If within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
锟斤拷If less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
锟斤拷If within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
锟斤拷If less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
Wednesday, October 30, 2019
2010 Cadillac Truck Escalade ESV AWD V8-6.2L Page 1586
2010 Cadillac Truck Escalade ESV AWD V8-6.2L Page 1586
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
锟斤拷If within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
锟斤拷If less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Install a 3 A fused jumper wire between the HVIC return circuit terminal 1 and the HVIC source circuit terminal 23.
4. Ignition ON, observe the BECM HVIC Source Current parameter.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA, test for proper PIM connector X1 terminal contact at terminal
1 and terminal 23. If the terminal contact tests normal, replace the PIM.
5. Remove the PIM terminal 1 to terminal 23 fused jumper wire.
6. Test for 5-18 mA with a DMM between the HVIC Source circuit terminal 23 and ground.
锟斤拷If within the specified range, test the HVIC Return circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Return circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
锟斤拷If less than the specified range, test the HVIC Source circuit for an open between PIM connector X1 and X350.
Danger: Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal
Protection Equipment (PPE) and proper procedures must be followed.
The High Voltage Disabling procedure will perform the following tasks:
* Identify how to disable high voltage.
* Identify how to test for the presence of high voltage.
* Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures
must be followed.
Failure to follow the procedures exactly as written may result in serious injury or death.
Important: Removal of the HV manual disconnect lever also opens the HVIC source circuit between X350 and BECM connector X1.
锟斤拷If the circuit tests normal, perform the High Voltage Disabling () procedure and test the HVIC Source circuit for an open between X350
and BECM connector X1. If the circuit tests normal, replace the BECM.
P1AE3 with or without P1B05 and P1B06
Important: DTCs P1B05 and P1B06 should always pass and fail together. If one DTC has passed while one has failed, replace the
drive motor generator power inverter control module (PIM).
1. Ignition OFF, wait 2 minutes.
Important: The drive motor generator control module sight shield must be installed during all testing in order to complete the HVIC
current loop.
2. Disconnect PIM connector X1.
3. Ignition ON, observe the BECM HVIC Source Current parameter. The parameter should display less than 5 mA.
锟斤拷If the HVIC Source Current parameter indicates current between 5-18 mA test the HVIC Source circuit for a short to ground between